Tenant satisfaction, maintenance & pipe boxing
The importance of maintaining quality standards and completing work within acceptable time frames have long been key considerations when planning social housing maintenance, heating efficiency improvements and safety upgrades, such
Pipe boxing made easy by Encasement
The Encasement range of pipe boxing and casings for social housing is widely used across the UK to conceal interior and exterior pipework in fire sprinkler installations, heating system upgrade
Simple sprinkler solutions from Encasement
Where fire sprinkler systems are being retrofitted in social housing tower blocks and flats, Encasement’s Versa range provides a cost-effective, durable and easy-fit solution when boxing-in surface-mounted sprinkler pipework. Pre-finished with
Encasement on show at Fire Sprinkler International 2022
Encasement will be exhibiting at this year’s Fire Sprinkler International (FSI) Conference & Exhibition, which takes place at the Park Plaza Riverbank Hotel in London on 31st May and 1st
Best in class – casings solutions for education
It has long been recognised that the educational environment can have a significant influence on student performance and wellbeing, a fact that has been further reinforced with the challenges experienced
We’re supporting National Sprinkler Week 2022
It’s National Sprinkler Week, from 16th to 22nd May, which sets out to further increase awareness of the benefits of fire sprinkler systems in domestic and commercial premises, as well as well
Arma metal pipe boxing- tough protection
Where external pipework needs to be concealed and protected against the risk of accidental damage, vandalism or theft, Arma metal pipe boxing provides a tough and versatile solution that also
Fire safety gets a push with National Sprinkler Week
From 17th to 23rd May, it’s National Sprinkler Week, an initiative by the National Fire Chiefs Council (NFCC) to raise awareness of fire sprinkler systems and their benefits, as well
Concealing fire sprinkler system pipework simply and effectively
Although the resumption of Phase 2 of the Grenfell Tower Inquiry has been postponed at least until February, due to Covid-19, it has already become evident, during the inquiry process,
Encasement’s pre-formed pipe boxing and casings conceal unsightly pipework
Encasement’s pre-formed plywood casings have been the preferred solution for social housing RMI for decades and with the growth in fire sprinkler installations; boiler system upgrades and distributed heating system